SPARTAN Superway Semester 2 Week 14

This week we were able to test the full track, bogie, and controls system. We ran a bogie around the closed track and were able to read the RFID tags and observe the servo switching. Once we began testing, we soon learned of minor changes that needed to be made. We then made these changes and perfected our controls system

In the coming week, we will be assembling the next two pods and getting our systems ready for Maker Faire. We need to ensure all three pods work and pack it up along with everything we will need for field repairs.